Work Currently Underway
• Milling of existing asphalt in the northbound slow lane starting at Pine Street will begin on Friday, July 9th. This is in preparation for the installation of the concrete lane, which will extend past the Frizzi Road intersection.
• Concrete in this section will begin to be placed on Saturday, July 10th.
• Replacement of curb, gutter, and sidewalk continues all week. This is composed of various sections throughout Mackenzie that have failed.
Work Planned for Next Week
• Concrete placement work in the Frizzi Road area should wrap up on Monday, July 12th. Due to road elevation adjustment, the concrete lane will remain closed to general traffic.
• Curb, gutter, and sidewalk replacement will continue all week, and will be ongoing until all the broken or failed sections along Mackenzie have been dealt with.
No comments:
Post a Comment