Courtesy of the City of Williams Lake:
The installation of new stormwater works continued this week on South Lakeside Drive, a fire hydrant has been installed. Next week’s work schedule includes installation of catch basins, stripping work along fill slopes, and work on curbs, gutters, and sidewalks.
The public is reminded that the portion of South Lakeside Drive between the Cariboo Adventist Academy and Hodgson Road is a construction area, and rough patches of road are to be expected. The contractor is regularly working on grading and repairing rough areas, but patience is requested because the high volume of traffic causes road condition to deteriorate quickly. Motorists are also reminded to obey the posted 30 km/h speed limit.
South Lakeside Drive will be repaved from Hodgson Road to the Cariboo Adventist Academy, the merge lane from Hodgson Road will be extended to Pioneer Drive, and a pedestrian/bike lane will be added from Hodgson Road to the Cariboo Adventist Academy. Work on the project is expected to continue through September.
No comments:
Post a Comment