Courtesy of the Sam Ketcham Pool Referendum Facebook page:
Question: Will the pool be closed for a long time?
Answer: The amount of time the pool would be closed depends mostly on the result of the referendum. The proposed project which would occur after a “Yes” vote can be built in two phases so that there is water open for public use most of the time during construction. In the recommended concept, the new leisure pool would be built first and the main tank would remain open during construction. When the leisure pool is complete, it would open and the main tank would be closed for replacement. This phased process would take between 16-20 months to complete. There would be short periods of time when both pools are unavailable.
In the event of a “No” vote for the referendum, replacement of the main tank will still occur and the entire pool area (including hot tub, wading pool, steam room and sauna) would be closed for approximately 12 months.